Automate Email Follow-Ups with Gmail & Google Sheets Using Multi-Stage Sequences

Go to Workflow
0 views
Built by Xavier Tai Xavier Tai
Created on June 09, 2026

Description

🔄 Daily Follow-Up System with Multi-Stage Sequences

What It Does
Automatically sends timed follow-up emails to leads based on a 4-stage sequence (Day 1, 3, 7, 14), updates tracking automatically, and calculates next follow-up dates. Set it once, add leads, and never manually track follow-ups again. Converts cold leads into warm opportunities through consistent, professional touchpoints.

How It Works
Schedule Trigger → Runs daily at 9 AM
Read Tracker Sheet → Gets all leads from Follow-Up Tracker
Filter Today's Follow-Ups → Only processes leads where "Next Follow-Up Date" = Today
Process Individually → Handles each lead one at a time (prevents rate limits)
Route by Stage → Sends appropriate email based on Day 1/3/7/14 stage
Send Stage Email → 4 different templates for each follow-up milestone
Update Last Sent → Records when email was sent
Calculate Next Date → Automatically schedules next follow-up (or marks complete)

🚀 SETUP INSTRUCTIONS

Step 1: Create Follow-Up Tracker Sheet
Create Google Sheet with tab "Follow-Up Tracker"
Add columns: Name | Email | Project/Interest | Timeline | Next Step | Stage | Next Follow-Up Date | Last Sent Date | Status
Populate with leads: Set Stage = "Day 1", Status = "Active", Next Follow-Up Date = desired start date
Update YOUR_GOOGLE_SHEET_ID in nodes 2, 7, and 8

Step 2: Configure Email Templates
Edit nodes 6-9 with your email templates
Replace YOUR_CALENDAR_LINK with your actual booking link (Calendly, etc.)
Replace YOUR_RESOURCE_LINK in Day 3 email with relevant content
Customize sender name/signature in all templates

Step 3: Setup Gmail Connection
Add Gmail OAuth2 credentials to all email nodes
Test workflow with one test lead first
Monitor Gmail sending limits (500/day for free accounts)

Step 4: Test the Sequence
Add one test lead with Next Follow-Up Date = today
Manually execute workflow to verify email sends
Check that Google Sheet updates correctly
Verify next stage is calculated properly

Nodes Used (2)

Gmail
n8n-nodes-base.gmail
Google Sheets
n8n-nodes-base.googleSheets